BACK TO PROJECTS
High-Rise Systems • STATUS: Execution

Commercial Hub

Project Overview
Site Lead Infrastructure Team
Phase Execution

Foundation design and structural framing for a 45-story eco-friendly commercial tower.

Project Overview

This 45-story commercial tower aims to redefine the local skyline while setting a new benchmark for sustainable high-rise construction. Focusing on the deep foundation design, we implemented mass-bored piling strategies that reduced soil displacement and achieved an immense bearing capacity to support the central core.

The framing utilizes a diagrid exoskeleton alongside an internal reinforced concrete core, allowing for completely column-free interior office spaces. This structural approach not only creates a breathtaking visual aesthetic but ensures extreme rigidness against lateral wind shear forces at high altitudes.

Technical Specifications

  • Height: 45 Stories
  • Foundation: Deep bored piles (50m depth)
  • Core Material: High-strength Green Concrete
  • Framing: Steel Diagrid Exoskeleton

Tech Stack

ETABS Tekla Structures SAFE

Milestones

  • Phase 1

    Foundation Pour

  • Phase 2

    Core Erection

  • Phase 3

    Diagrid Assembly